Skip to main content GhIE, Engineering bodies engage Roads Ministry over rising costs, project delays | GhanaFrontBusiness & Economy
Caleb Ahinakwah••318 words · 2 min read Ghana's engineering bodies are sounding the alarm on critical issues affecting the nation's infrastructure projects-find out what's at stake.
The Ghana Institution of Engineering (GhIE), the Engineering Council, and the Ghana Consulting Engineers Association (GCEA) have engaged the
Summary - read the full story for complete context.
Keywords
Explore related tagsMore from Business & Economy

A new export policy could upend Ghana's cashew trade - but will the president listen?
2d ago•
2 min read

A new digital hub could change how Ghana's plastic waste is bought, sold and tracked - but standards are key.
2d ago•3 min read

She sold bofrot at six, but one childhood moment changed everything - what happened next?
3d ago•5 min read

What happens when your most valuable knowledge walks out the door? Discover the strategies to keep it.
3d ago•2 min read
A late-night port operation has netted a massive haul - but the full scale of the network behind it is still unfolding.
A joint NACOC and BNI operation at Tema Port has led to a major drug seizure and the arrest of five foreign nationals.

Why did 10,000 fans pack an Accra hotel for Larry Prince's birthday - and what's next?
Ghanaian musician Larry Prince hosted a star-studded birthday concert in Accra, drawing thousands.

A young apprentice's encounter with a neighbor's child leads to a courtroom decision that shocks the community.
A 21-year-old mechanic apprentice faces court in Amasaman over allegations involving a 12-year-old girl.

A policy shift on gifted students and BECE rules is under review - but what will it mean for parents and pupils?
NaCCA is reviewing its 2024 policy on gifted and talented students, according to a technical advisor to the education ministry.

Ministry challenges unposted doctors group to prove its claims - what happens next?
The Ministry of Health has responded to claims by the Association of Unposted Medical Officers regarding the posting of newly qualified doctors.

Why is one manufacturer being singled out by the tax authority, and what could it mean for other businesses?
Ghana's tax authority has invited Keda Ghana, a leading ceramics manufacturer, to a special compliance programme in Accra.