Accra-Kumasi Expressway: GAF clears 170km corridor, only 6km left
With only six kilometres left to clear, what challenges did the Ghana Armed Forces Engineers overcome to reach this critical stage of the
The Ghana Armed Forces Engineers are nearing completion of the 176-kilometre corridor for the proposed Accra-Kumasi Expressway. This preparatory
Summary - read the full story for complete context.

Image: Adom Online
GhanaFront aggregates news from trusted sources. Click to read the original article.
Keywords
Explore related tagsMore from Adom Online
Related Stories
More from Regional

Firefighters rescue 68 after accident involving 2 buses on Kumasi-Accra Highway
Discover the details of the accident on the Kumasi-Accra Highway that led to a major rescue effort.
1d ago•2 min read

More than 80 people including a baby feared dead after boat carrying 127 drifts in Atlantic for 27 days
Spanish rescuers located a vessel with 44 survivors, but the full extent of the tragedy remains unclear.
31m ago•2 min read

GIF bemoans personnel shortage as killings of forest guards escalate
Amidst increasing attacks on forest guards, the Ghana Institute of Foresters is sounding the alarm about a critical shortage of personnel.
36m ago•2 min read

Underage riders driving rise in motorcycle crashes - Motor Riders Union
Discover the alarming factor identified by the Motor Riders Union as a major contributor to the rising number of motorcycle accidents.
1h ago•3 min read


